Closures scheduled for McCarran Airport Connector - FOX5 Vegas - KVVU

McCarran Airport Connector closures continue overnight

Posted: Updated:
LAS VEGAS (FOX5) -

Construction of a bridge expansion project is causing closures of northbound and southbound lanes of the Airport Connector at the I-215 various times over the next two weeks. I-215 will close between Interstate 15 and Windmill Lane from 7 p.m. to 5 a.m. daily until August 16.

The Clark County Public Works projects will eventually provide additional travel lanes in each direction of I-215.

Detour routes are posted, taking Northbound motorists to the Warm Springs Road off-ramp, where traffic is directed east on Warm Springs and then back to the I-215 heading west to the Airport Connector Tunnel. On dates when southbound access is restricted, drivers will be detoured to exit the Airport Connector at Hidden Wells Road, turn left (south) on Gilespie Street, then left (east) onto Warm Springs, where they can re-enter the eastbound I-215.

The tunnel north of I-215 leading into the airport will remain open during this work.

The work schedule is as follows:

 • From 7 p.m. on Sunday, Aug. 5, until 5 a.m. on Monday, Aug. 6; and from 7 p.m. Monday, Aug. 6 until 5 a.m., Tuesday, Aug. 7: Southbound Airport Connector at the 215 will be closed.

• From 7 p.m. on Tuesday, Aug. 7, until 5 a.m. on Wednesday, Aug. 8; and from 7 p.m. on Wednesday, Aug. 8, until 5 a.m. Thursday, Aug. 9: Northbound Airport Connector at the 215 will be closed.

• From 7 p.m. on Sunday, Aug. 12, until 5 a.m. Monday, Aug. 13; and from 7 p.m. Monday, Aug. 13 until 5 a.m. Tuesday, Aug. 14: Southbound Airport Connector at the 215 will be closed.

• From 7 p.m. Tuesday, Aug. 14, until 5 a.m. Wednesday, Aug. 15; and from 7 p.m. Wednesday, Aug. 15, until 5 a.m. Thursday, Aug. 16: Northbound Airport Connector at the 215 will be closed.

The airport connector bridge is the first of five bridges that will be expanded as part Clark County Public Works' federally funded I-215 Airport Connector Phase 1. The project started in January and officials expect it to be complete in January 2014. Bridges over Paradise, Warm Springs and Robindale Roads, as well as Duck Creek will be expanded as part of the project.

More information about the Airport Connector project is available at www.AirportConnectorLV.com.

Copyright 2012 KVVU (KVVU Broadcasting Corporation). All rights reserved.

  • Most Popular StoriesMost Popular Stories

  • Monday, May 20 2013 10:13 PM EDT2013-05-21 02:13:41 GMT
    A high-speed crash on Sunday sent three teens to a hospital. One of them is listed in critical condition. The crash occurred in an area of the Valley known for speeding, the industrial zone located at
    A high-speed crash on Sunday sent three teens to a hospital. One of them is listed in critical condition.
  • Monday, May 20 2013 8:39 PM EDT2013-05-21 00:39:48 GMT
    An anonymous tip led investigators to arrest two men accused of taking an iPad from a teen and running him over with a vehicle, according to Las Vegas Metro police. Michael Solid, 21, and Jacob Dismont,
    An anonymous tip led investigators to arrest two men accused of taking an iPad from a teen and running him over with a vehicle, according to Las Vegas Metro police.
  • Monday, May 20 2013 10:58 AM EDT2013-05-20 14:58:33 GMT
    The owner of the soon-to-be reopened Downtown Grand casino announced it has begun taking applications to hire more than 800 positions.
    The owner of the soon-to-be reopened Downtown Grand casino announced it has begun taking applications to hire more than 800 positions.
Powered by WorldNow
Fox 5
Powered by WorldNow CNN
All content © 2013, KVVU Broadcasting Corporation, Las Vegas, NV and WorldNow. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.